TSMC Sets 'Volume Production' Target Date for 1.6nm Chip
01/17/2025, 03:06 PM UTC
台积电为1.6nm芯片设定量产目标日期TSMC sets 'volume production' target date for 1.6nm chip
➀ 台积电正在增加支出,预计到2026年实现1.6nm芯片的量产;➁ 台积电计划在2024年增加2nm芯片的生产;➂ 台积电预计2025年营收将增长约20%。➀ TSMC is increasing spending to achieve volume production of 1.6nm chips by 2026; ➁ TSMC plans to increase production of 2nm chips in 2024; ➂ TSMC expects revenue to grow by approximately 20% in 2025.As the world's leading semiconductor company, Taiwan Semiconductor Manufacturing Company (TSMC) is planning a significant increase in its spending to achieve volume production of its cutting-edge 1.6nm chips by 2026. This move is expected to lead to substantial revenue growth for the company.
In preparation for the 1.6nm chips, TSMC is also planning to increase production of its 2nm chips throughout 2024. The company has reported its Q4 earnings, showing a year-on-year revenue increase of up to 37% to $26.88 billion. However, it anticipates a slight drop of 5.5% due to smartphone seasonality.
Despite these challenges, TSMC remains optimistic about its growth prospects. Vice Chairman and CEO C.C. Wei has stated that TSMC expects 2025 to be another year of substantial growth, with an internal forecast of approximately 20% revenue increase.
In terms of its technological roadmap, TSMC is on track to begin volume production of its 2nm node in the second half of 2025. This new node is expected to offer a 10-15% speed improvement or a 20-20% power improvement at the same speed, while increasing density by more than 15%. The 1.6nm chips, scheduled for production by 2026, are expected to provide an 8-10% speed improvement at the same power and an additional 7-10% density improvement compared to the 2nm chips.
---
本文由大语言模型(LLM)生成,旨在为读者提供半导体新闻内容的知识扩展(Beta)。