03/06/2025, 10:21 PM UTC
寓言:未来建筑的荒谬Fable: The Futuristic Folly
<p>➀ 这座耗资9亿美元的未来派建筑在开放11个月后因设计缺陷而倒塌;</p><p>➁ 倒塌原因归结于安全边际不足;</p><p>➂ 这个故事的寓意是,荒谬伴随着宏伟而来。</p><p>➀ The futuristic building, costing $900 million, collapsed 11 months after its opening due to design faults; </p><p>➁ The collapse was attributed to inadequate safety margins; </p><p>➂ The moral of the story is that folly follows grandeur.</p>
---
本文由大语言模型(LLM)生成,旨在为读者提供半导体新闻内容的知识扩展(Beta)。