➀ The plant requires an area of 6000-8000 square meters, with a standard steel structure, a height of no less than 8 meters, and preferably a steel floor and epoxy resin flooring. ➁ The plant should include a material/component warehouse, which can be in the form of shelves and fences. ➂ The plant must be fully compliant and suitable for long-term stable use. ➃ The plant is divided into two spans, each with a 10-ton overhead crane. ➄ Deionized water production equipment is required, and liquid cooling equipment must not use tap water for debugging. ➅ Standard industrial three-phase electricity is needed, with a single machine position requiring a 125A or higher distribution box and corresponding cables, and a total of four test positions. ➆ Large ceiling fans are needed within the site to ensure a good working environment for workers in summer. ➇ Regular industrial compressed gas must be provided. ➈ The surrounding area should have a range of outsourced resources such as argon arc welding, pickling and passivation, sheet metal spraying, wire harness making, and complete machine wiring.
Related Articles
- New MOSFETs Boost Current Sharing9 days ago
- IO-Link Proximity Sensor Reference Design10 days ago
- Industrial Multi-Sensor Reference Design21 days ago
- Flexible Gigabit Switches For Industrial Networks24 days ago
- Intel Core Ultra 7 in 5in industrial PC motherboard28 days ago
- 300W baseplate cooled PSUabout 1 month ago
- Remote Controller Transforms Productionabout 1 month ago
- NVIDIA’s Jetson Thor Module With 2070 Tflops Powers Industrial PCabout 2 months ago
- Touchless Fiber Optic Cleanerabout 2 months ago
- EtherCAT P Reference Design For Industrial Networksabout 2 months ago